Preparing a slideshow presentation 1. Vendor Proposal - Trium Biomedical / Runjian Co. has proposed an Energy-Saving Renovation Solution for Hospital Kuala Lumpur, targeted at a Specialized Complex and Ambulatory Care Centre (SCACC) Building. - 1st Scope: Upgrading the current building's HVAC sytem into an AI HVAC System and improve the energy saving - The whole proposal will be in format of Energy Performance Contract (EPC) for a period of 10 years 2. Pros (When implemented AI-HVAC System in SCACC Building) - Respond time will be nil - The available workers only need to attend breakdowns 3. Limitations: - Current HVAC equipments are not yet AI-compatible and need to add additional jobscopes of upgrading the whole HVAC systems to be AI-compatible - Will limit the job oppotunities for workers 4. Actions needed to be done: - Preparing the AI platform and upgrading the whole HVAC equipment to become AI-compatible - The necessary IoT network system needed to be implemented towards all the plant room in SCACC building - Vendor need to ensure that all materials/goods used are approved by EMAL (Material Approve List of JKR) 5. Future actions by vendor: - For EPC project proposal, vendor need to liase with RadiFEM HQ and send to Sustainability Program (SP) Department at BPKj - The said proposal needed to be consulted by SP BPKj - Because of the proposed project involve the use of Artificial Intelligence, vendor need to consult the advice from Jabatan Digital Negara (JDN) - The proposed 10-year EPC contract needed to be revised due to additional jobscopes
Preparing a slideshow presentation
1. Vendor Proposal
- Trium Biomedical / Runjian Co. has proposed an Energy-Saving Renovation Solution for Hospital Kuala Lumpur, targeted at a Specialized Complex and Ambulatory Care Centre (SCACC) Building.
- 1st Scope: Upgrading the current building's HVAC sytem into an AI HVAC System and improve the energy saving
- The whole proposal will be in format of Energy Performance Contract (EPC) for a period of 10 years
2. Pros (When implemented AI-HVAC System in SCACC Building)
- Respond time will be nil
- The available workers only need to attend breakdowns
3. Limitations:
- Current HVAC equipments are not yet AI-compatible and need to add additional jobscopes of upgrading the whole HVAC systems to be AI-compatible
- Will limit the job oppotunities for workers
4. Actions needed to be done:
- Preparing the AI platform and upgrading the whole HVAC equipment to become AI-compatible
- The necessary IoT network system needed to be implemented towards all the plant room in SCACC building
- Vendor need to ensure that all materials/goods used are approved by EMAL (Material Approve List of JKR)
5. Future actions by vendor:
- For EPC project proposal, vendor need to liase with RadiFEM HQ and send to Sustainability Program (SP) Department at BPKj
- The said proposal needed to be consulted by SP BPKj
- Because of the proposed project involve the use of Artificial Intelligence, vendor need to consult the advice from Jabatan Digital Negara (JDN)
- The proposed 10-year EPC contract needed to be revised due to additional jobscopes
Created using ChatSlide
The proposal outlines an AI-enabled HVAC renovation project under a 10-year Energy Performance Contract aimed at enhancing energy efficiency and control. Key benefits include near-zero response times through automation, allowing workers to concentrate on critical tasks. Implementation requires upgrading the HVAC system, AI platform, and IoT network. Governance involves using EMAL-approved materials, consulting with relevant stakeholders, and revising the EPC scope and pricing.