SITE VISIT REPORT Project Name: Construction of HVE Foundations & Cable Trench – Solar Power Plant Interim Connection to NGCP Bacolod Substation (138kV Bay 76) Location: Brgy. Magsilingan, Bacolod City, Negros Occidental Date of Site Visit: February 3, 2026
Created using ChatSlide
The site visit aimed to assess conditions, clarify project scope, and verify constraints for construction at the NGCP Bacolod Substation. The energized high-voltage environment features limited space, existing structures, and operational equipment. Key observations included proposed locations for foundations, fencing, and equipment installations. Notable constraints include manual excavation requirements, material availability issues, and adherence to strict safety standards. Recommendations...